What Does an Architect Actually Do During Construction?

Many clients assume the architect’s job ends when the drawings are done. In reality, some of the most valuable work happens after the permit is issued and the contractor mobilizes. This phase is called construction administration, or CA, and it is the part of the process where the design either becomes the building you approved or slowly drifts into something else.

In New York City, construction administration carries extra weight. Tight sites, landlord requirements, Department of Buildings (DOB) inspections, and a long list of trades all have to line up before you can legally open your doors. This guide explains what an architect does during construction, what they do not do, how a typical week looks, and how to get the most out of the service. 

It is written for tenants, owners, developers, and operators planning commercial or residential work in New York.

What Is Construction Administration?

Construction administration is the architect’s role during the building phase of a project. The architect represents the design intent and the owner’s interests while the contractor builds from the approved documents. Traditionally, architectural work is divided into phases: schematic design, design development, construction documents, bidding or negotiation, and construction administration. You can read more about the earlier phases in our guide to architectural design phases for NYC commercial real estate.

CA is not about standing over workers. It is about answering questions, reviewing what is being purchased and installed, keeping the paperwork moving, protecting the design, and making sure the finished space is ready for DOB sign-off and for you to use.

Who Does What During Construction

Construction projects involve several parties with distinct responsibilities. Confusion about who owns which job is one of the most common causes of friction on site.

Party

Main responsibility during construction

Owner or tenant

Makes decisions, pays for the work, approves changes and budget

Architect

Interprets the drawings, reviews submittals, observes progress, coordinates approvals, certifies stages of completion

General contractor

Builds the project, controls means and methods, manages subcontractors, schedule, and site safety

Engineers and consultants

Design and review their disciplines (structural, mechanical, electrical, plumbing, kitchen, lighting, and more)

Owner’s representative (if hired)

Manages the owner’s business interests: budget, schedule, and contracts

Special inspectors and DOB

Inspect specific work and issue approvals required by the NYC Construction Codes

If you are unsure whether you need someone in the owner’s representative role, our articles on what an owner’s representative actually does and whether you need one break down how that role differs from the architect’s.

What an Architect Does Before the Building Starts

Construction administration really begins as the project transitions from design to construction. A few tasks set the tone for everything that follows.

Bidding and Contractor Selection Support

On many projects, the architect issues the bid set, answers bidder questions, issues addenda when the documents change, and helps the owner compare proposals. Comparing bids line by line matters because the lowest number is often low because something was excluded. A good architect helps you spot missing scope, unrealistic allowances, and assumptions that will turn into change orders later.

Reviewing the Construction Contract Documents

The architect does not sign the contract between owner and contractor, but should be familiar with its terms. The contract determines how submittals, changes, payments, and closeout work, and the architect’s role is usually described in it. Reading it early avoids surprises.

The Preconstruction Meeting

Before work begins, the team meets to agree on how the project will run. Typical topics include:

  • The construction schedule and key milestones
  • The submittal log and long lead items
  • How RFIs and change requests will be submitted and how fast they will be answered
  • Site logistics, work hours, deliveries, and building rules
  • Insurance certificates and landlord requirements
  • Which inspections are required and who schedules them

In New York, building management often adds its own rules on freight elevator use, after-hours work, and protection of common areas. Settling these early prevents delays.

Confirming the Permit Is in Place

Work should not start until the DOB permit is issued. The architect, usually acting as the applicant of record, confirms that the approved scope matches what the contractor plans to build. For a refresher on how project types affect approvals, see accurate project classification.

The Core Duties of an Architect During Construction

Reviewing Submittals and Shop Drawings

A submittal is a package the contractor sends before ordering or installing something: a product data sheet, a sample, or a shop drawing. Shop drawings are detailed fabrication drawings, for example for millwork, metal work, stone, storefront, or a custom light fixture.

The architect reviews each submittal to confirm it matches the design intent and the specifications. Reviewers typically respond with one of several outcomes: approved, approved as noted, revise and resubmit, or rejected. This is where quality is protected. A wrong finish, an incorrect dimension, or a substituted product is far cheaper to fix on paper than after it has been installed.

Submittals matter most for long lead items such as kitchen hoods, custom millwork, specialty glass, and lighting. Ordering those items late can hold up an opening date. Our piece on lighting trends and resources in NYC touches on why lighting decisions need to be locked in early.

Answering Requests for Information (RFIs)

An RFI is a formal question from the contractor when something in the documents is unclear, missing, or conflicts with field conditions. The architect researches the question, coordinates with engineers if needed, and answers in writing.

RFIs are normal and expected, especially in existing New York buildings where hidden conditions appear once walls open. A very high volume of RFIs can be a sign that the drawings were not detailed enough, which is why complete documents matter. See our overview of types of architectural drawings in NYC to understand what a full set includes.

Site Visits and Field Observation

The architect visits the site at intervals defined in the agreement. During a visit, the architect observes whether the work is generally progressing in line with the drawings, looks at completed and in-progress conditions, and identifies issues early. The visit is usually followed by a written field report with notes and photos.

Two points are worth understanding. First, site visits are observation, not supervision. The contractor is responsible for how the work is done. Second, more visits give more oversight but also cost more, so the number and timing of visits should be agreed up front and tied to key milestones such as rough-in, before walls are closed, and pre-finish walk-throughs.

Managing Changes: ASIs, Change Orders, and DOB Amendments

Changes happen on almost every project. The architect helps manage them in an orderly way.

  • Architect’s supplemental instructions (ASIs): Clarifications or minor revisions issued by the architect that do not change cost or schedule.
  • Change orders: Formal modifications to the contract that adjust price, time, or both. The contractor proposes pricing, the architect reviews it for reasonableness and scope, and the owner approves.
  • Post approval amendments (PAAs): In New York City, changes to the approved scope may need to be filed with DOB before they are built. The architect prepares and files these amendments so that the work in the field matches what DOB has approved.

Skipping the last step is a frequent source of problems at inspection time. Building something different from the approved plans, even with good intentions, can complicate sign-off. Our article on unpermitted construction in NYC explains what is at stake when work and approvals do not match.

Reviewing Payment Applications

Contractors typically bill monthly through a payment application that compares the work completed against a schedule of values. The architect reviews it against what has actually been built and certifies the amount that is appropriate to pay. On many projects the standard AIA payment forms are used. This step protects the owner from paying for work that has not been done and keeps cash flow tied to real progress.

Coordinating Consultants and Trades

A restaurant, retail store, or office is not designed by one person. Structural, mechanical, electrical, plumbing, fire protection, lighting, and sometimes kitchen or acoustic consultants all contribute. During construction the architect keeps these disciplines coordinated so that, for example, a duct does not collide with a beam or a light fixture does not land on top of a sprinkler head. Good MEP coordination also feeds into required certifications later in the project.

Coordinating Inspections and DOB Sign-Offs

New York projects require inspections at defined points. Some are performed by special inspectors and progress inspectors for specific scopes such as structural work, fireproofing, or energy code compliance. Others are performed by DOB and other agencies at the end of the job.

The architect’s role is to know which inspections apply, remind the team when they are due, review the reports, and prepare the documentation needed for final sign-off. Depending on the project, sign-off produces a Letter of Completion, a Temporary Certificate of Occupancy, or a new or amended Certificate of Occupancy. If the space will hold 75 or more people, additional approvals such as a Place of Assembly Certificate of Operation come into play.

If you are considering self-certification, see our overview of self-certification with DOB.

Punch Lists and Substantial Completion

Near the end of construction, the architect walks the space with the owner and contractor and creates a punch list: a written list of items that are incomplete, damaged, or not built as designed. Typical entries include paint touch-ups, hardware adjustments, missing trim, and fixtures that were installed incorrectly.

Substantial completion is the point at which the space can be used for its intended purpose, even if minor items remain. The architect evaluates whether that threshold has been met and documents the date. That date often triggers warranty start dates and affects final payments.

Project Closeout

Closeout is the final administrative stage and it is easy to underestimate. The architect helps assemble and review:

  • Record drawings that show the space as actually built
  • Operation and maintenance manuals for equipment
  • Warranties and guarantees
  • Final lien waivers and contractor sign-offs
  • Final inspection documents and approvals
  • Attic stock, such as spare tiles or paint, where specified

These documents are what you will rely on when something needs service in year three, so a thorough closeout has long-term value.

What Architects Do Not Do During Construction

Understanding the boundaries prevents unrealistic expectations.

  • Directing the workers. The contractor controls means, methods, sequencing, and site safety. The architect observes results, not labor.
  • Guaranteeing the contractor’s performance. The architect can identify deficiencies but cannot guarantee schedule or cost.
  • Hiring and managing subcontractors. That belongs to the general contractor.
  • Setting the contractor’s prices. The architect reviews pricing for reasonableness but does not control it.
  • Acting as your business representative. Managing owner-side budgets, financing, and contracts is a different job, which is where an owner’s representative can help.

What a Typical Week Can Look Like

Every project is different, but an illustrative week during the build-out of a Manhattan retail or restaurant space might look like this:

  • Monday: The architect reviews three submittals, including a millwork shop drawing and a tile sample, and returns them with comments.
  • Tuesday: The contractor opens a ceiling and finds an existing duct in conflict with a planned light line. An RFI comes in, and the architect coordinates with the mechanical engineer on a revised routing.
  • Wednesday: Site visit before drywall closes. The architect photographs framing and rough-in conditions and notes a missing blocking location for a wall-mounted fixture.
  • Thursday: The contractor submits a payment application. The architect compares it against the work observed and certifies the appropriate amount.
  • Friday: The owner asks for a change to the bar layout. The architect issues a sketch, requests pricing, and checks whether the change affects occupant count or requires a DOB amendment.

Small decisions like these, made quickly and documented, are what keep a project on schedule.

Problems Construction Administration Helps Catch

A committed CA team often prevents issues that are expensive to reverse:

  • Material substitutions that change appearance, durability, or code compliance
  • Dimensional conflicts between structure, ducts, plumbing, and finishes
  • Lighting mismatches where fixtures, drivers, or controls differ from the design
  • Millwork tolerance issues that only show up once cabinets meet uneven walls
  • Code items in the field, such as required clearances and accessibility features described in our guide on whether your restaurant is ADA compliant
  • Scope creep that quietly adds cost and schedule

Is Construction Administration Optional?

Technically, owners can decline full construction administration, and some do to save fees. It helps to understand the tradeoffs.

Without the architect involved, no one on your side is interpreting the drawings, reviewing submittals, or documenting deviations. The contractor may make reasonable-sounding decisions that conflict with the design or with the approved DOB filing. When issues appear at inspection, you may need to bring the architect back on urgent terms.

There is also a practical New York connection: the licensed professional who filed the project is generally the one who must document and support the final sign-off. Some owners choose a middle path, called limited construction administration, with fewer site visits and a focus on submittals, RFIs, and final approvals. That can be a reasonable option for smaller, lower-risk projects, as long as scope and expectations are written down.

How Construction Administration Is Scoped and Priced

Fees for CA vary by project and by firm, and are typically structured in one of three ways: as a fixed fee for a defined duration, hourly, or a hybrid with a base fee and additional services billed as needed.

Factors that influence scope include:

  • The expected length of construction
  • The number of site visits expected
  • The number of consultants to coordinate
  • The volume and complexity of submittals
  • Whether the project is phased or in an occupied building
  • The number of approvals and inspections required

To keep the scope clear, agree in writing on the number of visits, meeting frequency, and target turnaround times for RFIs and submittals. For a broader view of how architects support budgets, see the architect’s role in construction budgeting.

How Owners Can Get the Most From Construction Administration

A few habits make a noticeable difference.

  1. Hold regular owner, architect, and contractor meetings. A weekly meeting keeps decisions from piling up.
  2. Name a single decision-maker. Conflicting instructions from multiple people slow the project and create disputes.
  3. Respond quickly. Delayed decisions on finishes, fixtures, and changes are among the top causes of schedule slip.
  4. Route changes through the architect. Verbal side agreements with the contractor cause budget and permit problems.
  5. Order long lead items early. Approve hoods, millwork, glass, and lighting as soon as possible.
  6. Keep a contingency. Existing buildings hide surprises. Our guide to avoiding construction delays covers planning strategies that protect your opening date.
  7. Keep records. Written approvals, photographs, and meeting notes protect everyone.

Frequently Asked Questions

Does an architect supervise construction?

No. The contractor supervises the work and is responsible for means, methods, and site safety. The architect observes the work at intervals to confirm it is generally consistent with the design and documents, and reports concerns to the owner and contractor.

How often will the architect visit the site?

It depends on the agreement and the project. Many projects include visits at key milestones, such as before walls are closed and at completion, with additional visits as needed. Discuss the number and timing of visits before signing.

What is the difference between construction administration and project management?

Construction administration is the architect’s contract role during construction, focused on design intent, documentation, and approvals. Project management is broader and typically covers budget, schedule, procurement, and coordination across all parties. Our article on project management in architecture explores how the two fit together.

What is a submittal?

A submittal is a package the contractor submits for review before ordering or installing materials or equipment. It can include product data, samples, and shop drawings. The architect reviews submittals for conformance with the design and specifications.

What happens if the contractor deviates from the drawings?

The architect flags the deviation in a field report or written notice. The owner and contractor then decide whether to correct it, accept it, or formally change the documents. If the change affects approved DOB plans, an amendment may be needed.

Can a different architect handle construction administration?

It is possible, but it usually adds risk because the new architect must learn the design intent and take on responsibility for work they did not create. Roles such as design architect and architect of record can be split on some projects, as explained in our guide to architect of record vs design architect.

Do small renovations need construction administration?

Small projects may need less, but they still benefit from someone reviewing key materials, confirming code items, and closing out approvals. A limited scope is often a good fit.

Conclusion

Construction administration is where a good design becomes a well-built space. Reviewing submittals, answering RFIs, observing progress, managing changes, coordinating inspections, and closing out the project are the steps that protect your budget, schedule, and finished result.

At Parkbench Architects, we stay involved from concept through opening day, and we understand how New York agencies, landlords, and contractors work. If you have a project on the horizon, contact our team to talk about how construction administration can support it.